For AV integrators
monomanager is the integrator side of the same system: the installation is planned and documented here, handed over to the customer, and stays comparable afterwards — snapshots of what is really running, differences against the plan, and a documentation that does not stop at the handover.
In active development Runs on your own machine
What it is
The device list you plan with is the device list the customer monitors, and the one you compare against three years later when something has been swapped.
Rooms, devices and cabling documented while the project is still being built — block schematics, room layouts, rack elevations, the whole device list behind them.
The finished structure moves into the customer’s MonoLog instead of being typed in a second time — buildings, rooms, devices, addresses and drawings included.
Take a snapshot of the live installation whenever you are on site, compare it against the plan and against the last snapshot, and see what actually changed.
Over the service life
The strength of monomanager is not the drawing — it is everything that happens after it. Snapshots, comparison and sync keep the documentation and the real installation from drifting apart, which is the state every AV project ends up in otherwise.
Placeholder text — the final wording for this page follows.
Contact
It is not generally available yet. Leave a note and you will hear from us when there is something real to show.